Every summer the Serpentine Pavilion brings a new piece of architecture to Kensington Gardens. In 2022 it was Black Chapel, designed by the artist Theaster Gates: a dark, timber-clad space for gathering, music and reflection.
ATOL was proud to be part of it. Our job was to make sure the timber met its fire rating without changing the look the artist wanted. This post explains how.
The challenge: timber, fire and a black finish
Timber is a beautiful material, but untreated boards can spread flame quickly across their surface. In a public building that has to be dealt with. The usual fixes can change the colour or texture of the wood, and on a project like Black Chapel, where the finish is the whole point, that wasn’t an option.
Working with the designers from the start
We worked with the design team early on, so the fire protection and the finish were planned together rather than one fighting the other. That meant agreeing which products would be used, how they would sit with the black colour, and what the boards needed to achieve.
What we did
- Fire upgraded every board. All of the timber boards, more than 1,500 sqm of them, were treated with a tested fire retardant to reduce surface spread of flame.
- Coloured them black. We then finished the timber in black to the designers’ specification, so the fire protection sits inside the finish and can’t be seen.
The result was a striking, fully compliant temporary building that welcomed visitors safely through the summer, and was designed to be relocated afterwards.
Why it matters for other timber projects
Architects and designers are using more exposed timber than ever, in pavilions, offices, schools and homes. The lesson from Black Chapel is simple: bring fire protection in at design stage and it doesn’t have to compromise the look. Leave it to the end and you may find the finish you wanted no longer works.
See the full project on our Black Chapel case study, or read more about timber fire protection.
Need a price?
Send us your drawings, survey or specification through our Get a Price page and we’ll come back with a priced quotation, or call us on 0330 094 9099.
Got drawings? Get a price.
Send us your drawings, steel schedule or area take-off and we will come back with a priced quotation. On-site and off-site application, firestopping, fire doors and surveys across London, Dubai and Europe.