Get In Touch
ATOL Construction Ltd
ATOL Construction, China Works, Black Prince Road, London, SE1 7SJ, England
Work Inquiries
hello@atolconstruction.co.uk
0330 094 9099

Case Studies

Black Chapel Serpentine Pavilion — London

ABBA Voyage Arena — London

Royal Albert Hall — London

York House Wembley Park — London

Canopy Hotel by Hilton — London

Imperial War Museum — London

Canterbury Cathedral — Kent

Chessington World Of Adventure — London

Third Space Gym — London

Derren Brown Ride — Thorpe Park

The Savoy — London

Cremer Street — London

The Historic Dockyard Chatham – Kent

Warner Bros Holborn — London

Malthouse Performing Arts Centre — Kent

Port Lympne Zoo — Kent

We use cookies to give you the best experience.
June 6, 2022

Black Chapel Serpentine Pavilion — London

Overview ATOL is the logical choice for implementing your passive fire protection systems. Protecting the safety and wellbeing of your employees, customers and occupants is our number...
  • Strategy

    Timber Fire Protection

  • Client

    StageOne

View Project

ABBA Voyage Arena — London

Overview ATOL has long been at the forefront of major projects across the UK from Hotels, Refurbishment of National Heritage Property to Entertainment of the nation with...
  • Strategy

    Firestopping, Timber Fire Protection

  • Client

    Xylotek

View Project
March 24, 2022

Royal Albert Hall — London

Overview ATOL was instructed to carry out passive fire protection to the substrate at the Royal Albert Hall in London for the main contractor. Fire stopping was...
  • Strategy

    Firestopping, Concrete Fire Protection

  • Client

    X Construct

View Project
March 24, 2022

York House Wembley Park — London

Overview ATOL was instructed to carry out passive fire protection to the substate on the multi-storey refurbishment at the York House Wembley Park for the main contractor. Application...
  • Strategy

    Firestopping, Concrete Fire Protection

  • Client

    X Construct

View Project
March 24, 2022

Canopy Hotel by Hilton — London

Overview ATOL was instructed to carry out fire protection and concrete analysis to the substate on the multi-storey refurbishment at the Canopy Hotel by Hilton and their...
  • Strategy

    Firestopping, Concrete Fire Protection

  • Client

    X Construct

View Project
February 1, 2020

Imperial War Museum — London

Scope of Works We were asked by the main contractor. Clean all areas from contamination, once clean then apply Dulux Metalshield primer to the manufacturer’s specification of...
  • Strategy

    Firestopping

  • Client

    Buxton Building

View Project
March 24, 2022

Canterbury Cathedral — Kent

Overview ATOL was instructed to carry out passive fire protection to the famed Canterbury Cathedral in Kent. Timescale 1 month Area 5,000m² Services Used Aithon A90H Fire coating Concrete upgrade
  • Strategy

    Firestopping, Concrete Fire Protection

  • Client

    X Construct

View Project
March 24, 2022

Chessington World Of Adventure — London

Overview ATOL was instructed to carry out passive fire protection to the substrate at Chessington World Of Adventure for the main contractor. Application and repairs to concrete were...
  • Strategy

    Firestopping, Concrete Fire Protection

  • Client

    X Construct

View Project
July 24, 2020

Third Space Gym — London

Scope of Works We were asked by the client to spray a beautiful new gym to match the complete design. All steels to have the manufacturer’s specification and...
  • Strategy

    Firestopping

View Project
July 24, 2020

Derren Brown Ride — Thorpe Park

Scope of Works ATOL was responsible for fireproofing and protecting all the steels on the innovative and original Derren Brown Ride at Thorpe Park. Preparation The full survey was...
  • Strategy

    Firestopping

View Project
July 24, 2020

The Savoy — London

Scope of Works Installation of fire barriers to the ceiling voids of the beautiful and iconic Savoy Hotel. All in accordance with the site survey, drawings and samples...
  • Strategy

    Firestopping

View Project
July 24, 2020

Cremer Street — London

Scope of Works ATOL Construction carried out fire-stopping works to this beautiful six-story building located in the heart of Hoxton which includes 98 modern offices, workshops, and...
  • Strategy

    Firestopping

  • Client

    HG Construct

View Project
October 5, 2018

The Historic Dockyard Chatham – Kent

Scope of Works ATOL was appointed to work on multiple million historic refurbishments, specialist experience in delivering comprehensive fire stopping and fire coating systems installations, ATOL...
  • Strategy

    Intumescent Coating

  • Client

    Buxton Building

View Project
April 12, 2019

Warner Bros Holborn — London

Scope of Works ATOL provided firestopping installion to a refit of commercial buildings with Aithon A90H concrete soffit intumescent paint. This was tested to 240 minutes fire resistance...
  • Strategy

    Concrete Fire Protection

  • Client

    Warner Bros

View Project
July 24, 2020

Malthouse Performing Arts Centre — Kent

Scope of Works ATOL was appointed to work on multiple million historic refurbishments, specialist experience in delivering comprehensive firestopping and fire coating systems installations, ATOL prides itself...
  • Strategy

    Firestopping

  • Client

    Buxton Building

View Project
July 24, 2020

Port Lympne Zoo — Kent

Scope of Works ATOL Had the pleasure and was responsible for fireproofing and protecting timbers in the historic Port Lympne Zoo in Kent manor house. Preparation All areas to...
  • Strategy

    Firestopping

View Project