The Royal Albert Hall is one of the best known buildings in London, and one of the busiest. It is Grade I listed, it hosts hundreds of events a year, and below the auditorium sits a large undercroft full of services: pipes, cables and ducts running through walls and floors that are meant to hold back fire.
ATOL was brought in by the main contractor to carry out the passive fire protection in that undercroft. This post explains how we approached it, and why the work did not stop when we left site.
Start with a survey, not a sealant gun
In an older building, the biggest risk is what you can’t see. Over decades, services get added, moved and replaced, and every one of them leaves a hole in a fire-rated wall or floor. Before we firestopped anything, we carried out a consultancy and survey stage, mapping every service penetration passing through the fire-rated construction.
That gave everyone a clear picture of the work before anything was opened up: how many penetrations there were, what passed through each one, and what fire rating each wall or floor needed. It also meant the work could be priced and programmed properly, with no surprises halfway through.
Firestopping room by room
With the survey done, we worked through the undercroft room by room, sealing each penetration with a tested system chosen to suit the service and the rating of the wall or floor. On this job that meant the usual tools of the trade, used in the right place:
- Fire batt for larger openings with mixed services passing through.
- Intumescent fire mastic to seal gaps around pipes and cables.
- Pipe collars for plastic pipes, which soften and collapse in a fire and would otherwise leave an open hole.
- Wraps for pipes and services where a collar isn’t the right fit.
The key is matching each product to what it has been tested on. A seal that works on a steel pipe in a masonry wall may not be approved for a plastic pipe in a drylined wall. Getting that right on every single penetration is what makes the difference between firestopping that looks finished and firestopping that will actually perform.
Keeping it right: ongoing surveys
A working venue never stands still. Contractors come in to add new cables and services, and every new hole is a new breach in the compartment. That is why ATOL now carries out regular compartmentation surveys at the Hall.
Those surveys give the Hall’s team an up-to-date record of the fire stopping and catch new breaches early, before they become a problem at the next fire risk assessment or, worse, in a real fire. For any building owner with a busy estate, this is the part that is most often missed.
What other building owners can take from it
- Survey first. You can’t fix penetrations you haven’t found.
- Use tested systems that match each service and each wall or floor.
- Keep records, and keep checking. Firestopping is only as good as the last contractor who drilled through it.
You can see the full project on our Royal Albert Hall case study, and read more about our fire safety consultancy and firestopping in London.
Need a price?
Send us your drawings, survey or specification through our Get a Price page and we’ll come back with a priced quotation, or call us on 0330 094 9099.
Got drawings? Get a price.
Send us your drawings, steel schedule or area take-off and we will come back with a priced quotation. On-site and off-site application, firestopping, fire doors and surveys across London, Dubai and Europe.