Canopy Hotel by Hilton — London

Overview

ATOL was instructed to carry out fire protection and concrete analysis to the substate on the multi-storey refurbishment at the Canopy Hotel by Hilton and their mains contractor.

Application and repairs to concrete were carried out and the project was completed ahead of the program with a full report and sign off.

The protective finish on the ceilings is actually exposed to the customer which meant designing a system that left an industrial but high finish.

Additionally, ATOL then went on the complete new steel structure fire protection ahead of the program and sign off.

Timescale

3-6 months

Area

15,000m²

Services Used

  • Aithon A90H
  • Fire coating
  • Concrete upgrade
  • Steel protection
  • Strategy

    Firestopping, Concrete Fire Protection