Canopy Hotel by Hilton — London

Overview

ATOL was instructed to carry out fire protection and concrete analysis to protect the rib decking within the multi-storey refurbishment at the Canopy Hotel by Hilton and their mains contractor.

Application and repairs were carried out to the concrete ceiling and the project was completed ahead of the program with a full report and sign off.

The protective finish on the ceilings is actually exposed to the customer which meant designing a system that left an industrial but high finish.

Additionally, ATOL then went on the complete new steel structure fire protection ahead of the program and sign off.

 

Timescale
3-6 months

Area
15,000m²

Services Used

  • Fire coating
  • Concrete fire protection
  • Steel protection
  • Compartmentation survey
  • Strategy

    Firestopping, Concrete Fire Protection