Chessington World Of Adventure — London

Overview

ATOL was instructed to carry out passive fire protection to the substrate at Chessington World Of Adventure for the main contractor.

Application and repairs to concrete were carried out and the project was completed ahead of the program with a full report and sign off.

Timescale

1 month

Area

1,000m²

Services Used

  • Aithon A90H
  • Fire coating
  • Concrete upgrade
  • Strategy

    Firestopping, Concrete Fire Protection