

Chessington World Of Adventure — London
Overview
ATOL was instructed to carry out passive fire protection to the substrate at Chessington World Of Adventure for the main contractor.
Application and repairs to concrete were carried out and the project was completed ahead of the program with a full report and sign off.
Timescale
1 month
Area
1,000m²
Services Used
- Fire coating
- Concrete upgrade
