Get In Touch
ATOL Construction Ltd
First Floor, Oriac House, Unit 10, The Glenmore Centre, Shearway Business Park, Pent Road, Folkestone
Work Inquiries
hello@atolconstruction.co.uk
0330 094 9099
Cremer-Street-Atol-Construction-firestopping-6
Cremer-Street-Atol-Construction-firestopping-7 Cremer-Street-Atol-Construction-firestopping-5 Cremer-Street-Atol-Construction-firestopping-1
July 24, 2020

Cremer Street — London

Scope of Works

ATOL Construction carried out fire-stopping works to this beautiful six-story building located in the heart of Hoxton which includes 98 modern offices, workshops, and studio spaces.

The building was constructed with a steel frame structure recycling part of the existing building foundations. Designed with an industrial theme.

Preparation

All areas to be surveyed and tested for the correct loadings, all areas under loadings to be completed and top coated.

The total area of intumescent unfinished to be completed onsite from site instruction from the main contractor.

All areas are required to be masked including exposed walls/ceiling and protective flooring applied to assure protection from overspray.

Area

8500 m2

Installation

Steel intumescent coating system to be applied as recommended by manufacturers loadings to achieve the integrity specification required.

Services Used

  • Intumescent Steel Coating
Task

Fire protection of a beautiful office space in central London

  • Strategy

    Firestopping

  • Client

    HG Construct

Let’s collaborate

Got a project?

We use cookies to give you the best experience.