Savoy ATOL Construction
July 24, 2020

The Savoy — London

Scope of Works

Installation of fire barriers to the ceiling voids of the beautiful and iconic Savoy Hotel.

All in accordance with the site survey, drawings and samples carried out on-site. Fitted as per the manufacturer’s specifications.

Fire barriers to be constructed using Protecta Fire Batts and Protecta Mastic were installed.

All penetrations of fire barrier to having tested fire and smoke seals installed in line with the manufacturer’s system.

Preparation

Cleaning substrate in preparation for installing 30minutes of fire protection.

Area

5 Floors

Installation

Cut fire-rated batts to fit tightly into the voids that require protection.

All sides had fire-rated mastic applied before being friction fitted into place with all joints having mastic applied to create fire and smoke seal.

All penetrations to have appropriately tested fire seal fitted to manufacturers specification.

Services Used

  • Fire Barriers
  • Fire Mastic
Task

Fire stopping at the historic and beautiful Savoy in London

  • Strategy

    Firestopping